Step 1
-Turn off the AC Isolator
-Wait about 10 seconds

Step 2
-Turn off the DC switches located inside the DC Box

Step 3
-Please go to your DB where PV MCB/ ELCB were installed and kindly switch off those breakers.

Step 1
-Turn off the AC Isolator
-Wait about 10 seconds
Step 2
-Turn off the DC switches located inside the DC Box
Step 3
-Please go to your DB where PV MCB/ ELCB were installed and kindly switch off those breakers.